Heat and Power Plant with an Absorption Chiller
An 850 kW combined heat and power plant with an absorption chiller.
The systems ran perfectly until the end and all maintenance was
carried out.
No damage is known.
The CHP ran for 51,429 hours of operation.
The absorption chiller has run for 42,350 hours.
The following components use an overhauled long block or completely
overhauled. The components relevant to assemblies for "modernization"
were marked:
- complete panelling
- Interfaceschronk
- Oil relubrication pump
Mechanically overhauled and electrically tested
- Oil level monitoring
- Plotter heat exchanger"
- Pressure expansion foll3 (if present)
- Pressure transducer and temperature sensors
- Rubber rails for motor and generator
- Clutch element
- Air filter inserts
- Safety valves and arnot inserts
- Sylomer strips
- Hot water preheating pump and heating element
- Test run with performance and efficiency measurement
- Loosening
- Updated spare parts list and new circuit diagram
Optional:
- Generator (suitable for grid code)
- Exhaust gas heat exchanger
- Gas pressure control line"
- Integration new I pipework, module frame )
- Dia.ne XT3 module controller
- Complete documentation (maintenance log, descriptions, techn,
technical diagram, unit drawing )
Not included:
- Seals and connection parts on site
Motor type
JMC 316 GS-N.LC
Electrical output per unit: 835 kW
Thermal output per unit: 986 kW
Frequency: 50 Hz
Voltage: 400 V
Emissions according to valid TA Luft: NOx 500 mg/Nm 3
co 300 mg/Nm 3
The system is operated with natural gas in accordance with the
technical instructions TA 1000-0300.
electrical output 850 kW el.
thermal output 945 kW Emission values
NOx < 500 mg/Nm3 (5% 02)
CO < 300 mg/Nm3 (5% 02)
Find more here - /
Contact us at -