Back-pressure turbine
Manufacturer: Fa. KKK
First Start-up: 2002
Operating Hours of Turbine: 30.000h
Type: CFR5 G6a
Power Max: 2500 kW
Operational efficiency: 2200 kW
Revolution number: 23000 U /min
Live steam pressure: 65 bar
Live steam pressure temperature: 480 oC
Evaporation pressure: 1-17 bar
Investments in the year 2002 Entire steam transforming station from
63 bar to 2,5 bar renewed in 2002, El. Generator Fa. Leroy Somer, el.
Power 2 MW
renewed
Entire measuring -, governing and control of the turbine renewed
Steam turbine renewed
Installed boiler efficiency:
Boiler I Hard coal
Steam generation: 20 t/h, 63 bar, 495 oC
Boiler II Hard coal
Steam generation: 13 t/h, 34 bar, 425 oC
Boiler III: Combination burner for oil and gas
Steam generation: 20 t/h, 17 bar, 285 oC
General overhaul of the entire plant from 2002 to 2004
Steam generator renewed
automatic cole-loader and ashremoval plant renewed
Water treatment plant renewed
entire instrumentation renewed
Flue gas purification plant Fa. Lurgie of 1991 - 2001 renewed
Errors excepted!